24 Hours To Improving Local Plumber Glasgow

How to Fit Bar Mixer Shower Pipework

This post discusses how to 1st fix pipework for a bar mixer shower valve setup.

Introduction

When setting up a bar mixer shower valve such as the one revealed, it is first needed to run hot and cold pipework to the valve.

Installing a Bar Mixer Shower Valve

Please see Choosing a shower for your bathroom to learn more on shower types and their suitability for your restroom.

This is done by recessing the pipes within the wall prior to tiling.

In this case study I will be recessing the pipework into a bathroom wall that has actually already been dot n dabbed with wetness resistant plasterboard.

Doing the plaster-boarding before the 1st repair pipework makes it easier to get perfectly flat & level walls as you don't have the fiddly task of trying to fit the boards around/ over the pipework (to name a few things.).

Walls likewise require to be square in the corners to allow a good seal (along the edge of the bath in this circumstances.).

Please see Preparing walls for tiling-- reboarding for additional information connecting to this subject.

Method.

Using Bath to Mark Overflow/Waste and Center of Bath Taps.

The bath is momentarily placed in position, and the centre line (that goes through the overflow/ waste and the centre of the bath taps) is marked.

This will assist us line the shower valve up with the taps for a more aesthetically pleasing finish.

The horizontal level of the bar mixer shower valve is then marked, which is normally around 130cm from the floor. If you are intending to fit a bar mixer shower with a repaired riser and shower head, you will require to make sure that this height enables you to fit the shower in without it striking the ceiling.

Correct Shower HeightIncorrect Shower Height.

Next the pipe centres are marked with vertical lines at 150mm centres i.e. 75mm away from the centre line in both directions. This is where the pipework will range from the valve, down the wall and connect to the pipework under the bath.

The majority of bar mixer shower valves accept pipework at 150mm centres as this is considered basic-- if your specific model has a various pipeline centre value, then you need to reflect this at the marking out stage.

An area to be gone after out is then marked (into which the pipes can be recessed beneith the surface of the plasterboard.).

The approximate height of the bath rim is also marked at this stage.

Correct Shower Height.

The locations to be gone after out are then chased after out utilizing an exact saw, ensuring that they extend below the level of the bath rim, which is marked in pencil on the plasterboard.

Here we can see the pipework under the bath that will be extended up to feed the shower valve.

The hot feed will be added the left hand channel, and the cold feed will be added the right-hand man channel.

This is due to the fact that the hot feed will go into the valve left wing (as we take a look at it) and the cold eat the right.

This is an industry requirement.

Because of this, the pipework under the bath remains in line with this setup.

You can see that the bath waste pipe & trap has actually also been fitted at this time. When the bath was in position, a cross was marked on the flooring through the waste hole in the bottom of the bath to mark the necessary place of the bath trap.

Copper Pipework Is Soldered And Then Placed Into The Channels.

Two pieces of 15mm copper pipework are then soldered together with a 90º elbow for each feed, which are then positioned into the channels as shown.

The horizontal pieces of copper (at http://remingtonyrrt324.cavandoragh.org/getting-tired-of-plumbing-in-glasgow-10-sources-of-inspiration-that-ll-rekindle-your-love the top) will eventually be lowered to enter into the back of the bar mixer valve.

The pipes are held level and square to the wall at 150mm centres (centred on the preliminary centre line) by a home-made jig which is screwed to the wall momentarily. This is very important as attaching the shower valve relies on this phase of the work being done properly:.

Pipes Are Held Level And Square To The Wall.

It is important the the pipes are recessed far enough into the wall so that the 90º elbow fitting does not extend out beyond the finished tiled surface area.

This will guarantee that it does not interfere with the fitting of the bar mixer shower valve.

Inaccurate Shower PipeworkCorrect Shower Pipework.

The pipes are then protected in place by using either drywall adhesive, rapidset tile adhesive or a sand-cement mix.

If using a mix containing cement, please ensure the pipes are covered in duct tape to avoid the cement from attacking the copper which could result in pinholes and leakages developing over time.

The mix is pressed in and around the pipes and is utilized to support the cut edges of the plasterboard.

Mix Is Levelled Off Flush With Surface of Plasterboard.

This is then levelled off flush with the surface area of the plasterboard, ensuring access to the bottom of the pipes is left open so that they can be linked up later on.

Batons are screwed and glued to both walls surrounding the bath, and these will help to take the weight of the bath when it is full of water and/or occupants. This will avoid it from dropping, which can result in broken silicon seals and water ingress issues.

Briefly Position The Bath to Allow For The Pipework To Be Connected.

The bath is then briefly put in position to enable the pipework to be connected.

The existing hot and cold pipework is connected to the proper pipework in the wall that will feed the shower valve.

Arrangements are also made at this stage to connect the bath taps-- via flexible push fit tap ports in this instance.

Just like the shower valve, hot is on the left and cold on the right (as you take a look at the tap) so this makes pipework much easier.

Jig Is Removed And Voids Are Filled With Adhesive.

As soon as the adhesive holding the pipes has gone off and the pipes are securely kept in the right position, the jig can be gotten rid of and any remaining spaces filled in with more adhesive.

As the pipework is now connected to the hot and cold supplied, stop ends can be seen in location at the ends of the pipes.

The bath is now be set up, and you can see the primary silicon seal around the edge of the bath in this picture.

Tanking And Tiling The Walls.

The walls are then tanked and tiled.

Setting Up a Bar Mixer Shower Valve.

The No. 1 Question Everyone Working In Paisley Plumber Should Know How To Answer

Plumbing Tips You Can Try Out On Your Own

The distinction in between taking care of your own plumbing problems and working with outdoors aid is amazing when it pertains to your cash flow. Why not see if you can do some of the jobs yourself? Or at least become a bit more educated on the topic. Here are some useful realities and ideas.

Prior to starting any plumbing project make certain to switch off the primary water supply. Water damage can be one of the most costly things to repair. To reduce damage turn the main supply of water off in addition to any shut down valves near where you are working. This will save a lot of difficulty in the future.

If the water is not entering into your dishwasher, the first thing you must do is shut off the water under the sink. Opportunities are that you have some type of obstruction, and keeping the water switched on might really develop a bigger issue. To repair the clog, you might require to call a plumber.

Prevent permitting outside faucets to freeze in the winter season by being proactive with your method. By merely getting rid of tubes, turning off the water to your outside components, and draining out any remaining water in the system you can prevent frozen pipes loaded with ice that can result in comprehensive damage and expensive repair costs.

Prior to you start a plumbing project you ought to tighten all of the pipes that are easily accessible. Particularly if your pipes https://penzu.com/p/37e72fab are making a variety of loud banging sounds, as this is a clear indication that there are loose pipes along the line. It is also a great concept in case there is a obstruction so the excess pressure launched does not break a loose pipe.

If the pipes have burst in an upstairs location, utilize a tool to perforate the ceiling beneath in numerous places and locations pots and pans under to capture the water. If this is refrained from doing, the weight of the building up water might cause a collapse of the whole ceiling.

To make certain there is no accident or unexpected rush of water when you deal with a plumbing task, make certain you are ready for a cleanup. If you enter into the work with a big stack of towels and blankets ready to take in water, the prospect of needing to really do it will keep you alert sufficient to avoid setting off the accident in the first place.

Make sure overflow holes are cleared out. This can assist to prevent any water damage. Overflow holes are a method to stop water from overruning if a sink is left on by mishap. If the overflow hole is clogged it will not have the ability to do its job.

Ensure that when you are doing any house enhancements to your plumbing that they are done up to the building regulations in your area. The building regulations exist to safeguard individuals from being heated by warm water, trap harmful sewer gas from getting in the house, and ensure plumbing is done correctly before finishes are applied.

In conclusion, you know that your pocketbook will definitely take a hit if you have to rely on outside help for all of your plumbing issues. Utilize the suggestions in this short article and you may deal with any issues that might occur with the plumbing in your family from now on.